CMAT and Company

"Better Today Than Yesterday"

CMAT and Company Operations

Team's Manual

Curriculum

Welcome to CMAT and Company

CMAT and Company ROTATION SCHEDULE 

Five Team [A, B, C, D, E], Five Work Area [1, 2, 3, 4, 5] Rotation (Rev. 2004)

Work Area 4 to Work Area 5

Work Area 5 to Work Area 1

Work Area 1 to Work Area 2

Work Area 2 to Work Area 3

Work Area 3 to Work Area 4

Back to Team Structures.

 

Four Team, Five Work Area Rotation (Rev. 2003)

                             MANAGER                  MANAGER        MANAGER         MANAGER        MANAGER

                                  ONE                             TWO               THREE                FOUR                FIVE

TEAM

1ST SIX  WEEKS

2ND SIX WEEKS

3RD SIX WEEKS

4TH SIX WEEKS

5TH SIX WEEKS

6TH SIX WEEKS

A, B,  C, D

Project Design One (PD1) Weeks 5 and 6

Rotational Project Design One (RPD1)

Rotational Project Design Two (RPD2)

Rotational Project Design Three (RPD3)

Final Project Design (FPD)

FPD Final Cut “Projector, “.avi”, “Shockwave”

WORKING PAIR ONE

Micro Soft Power Point

Adobe Premiere or Photoshop

Macromedia Director and Administration

Newtek Lightwave or 3D studio Max

As directed by the team.

WORKING PAIR TWO

Micro Soft Power Point

Newtek Lightwave or 3D studio Max

Adobe Premiere or Photoshop

Macromedia Director and Administration

As directed by the team.

PAIR THREE

Micro Soft Power Point

Macromedia Director and Administration

Newtek Lightwave or 3D studio Max

Adobe Premiere or Photoshop

As directed by the team.

2003 addendum:

Work Area Software by Teams

Team A Team B Team C Team D
Work Area 1 3D Max 3D Max Lightwave lightwave
Work Area 2 Lightwave Lightwave 3D Max 3D Max

 

Back to Team Structures.