|
CMAT and Company Operations
Team's Manual
Curriculum
Welcome to CMAT and Company
| |
CMAT and Company ROTATION SCHEDULE
Five Team [A, B, C, D, E], Five Work Area [1, 2, 3, 4, 5] Rotation (Rev. 2004)
Work Area 4 to Work Area 5
Work Area 5 to Work Area 1
Work Area 1 to Work Area 2
Work Area 2 to Work Area 3
Work Area 3 to Work Area 4
Back to Team Structures.
Four Team, Five Work Area Rotation (Rev. 2003)

MANAGER MANAGER
MANAGER MANAGER MANAGER
ONE TWO
THREE FOUR FIVE
TEAM
|
1ST SIX
WEEKS |
2ND SIX
WEEKS |
3RD SIX
WEEKS |
4TH SIX
WEEKS |
5TH SIX
WEEKS |
6TH SIX
WEEKS |
|
A, B, C, D |
Project Design One
(PD1) Weeks 5 and 6 |
Rotational Project
Design One (RPD1) |
Rotational Project
Design Two (RPD2) |
Rotational Project
Design Three (RPD3) |
Final Project Design
(FPD) |
FPD Final Cut
“Projector, “.avi”, “Shockwave” |
|
WORKING PAIR ONE |
Micro Soft Power
Point |
Adobe Premiere or
Photoshop |
Macromedia Director
and Administration |
Newtek Lightwave or
3D studio Max |
As directed by the
team. |
|
WORKING PAIR TWO |
Micro Soft Power
Point |
Newtek Lightwave or
3D studio Max |
Adobe Premiere or
Photoshop |
Macromedia Director
and Administration |
As directed by the
team. |
|
PAIR THREE |
Micro Soft Power
Point |
Macromedia Director
and Administration |
Newtek Lightwave or
3D studio Max |
Adobe Premiere or
Photoshop |
As directed by the
team. |
2003 addendum:
|
Work Area Software by Teams |
Team A |
Team B |
Team C |
Team D |
| Work Area 1 |
3D Max |
3D Max |
Lightwave |
lightwave |
| Work Area 2 |
Lightwave |
Lightwave |
3D Max |
3D Max |
Back to Team Structures.
|