
Thomas Haley Elementary School
Thomas Haley has a strong rebuild case because its infrastructure and educational limitations are occurring together. The campus was constructed in 1959, and the report identifies aging HVAC equipment (No HVAC in the hallways), poor corridors and restrooms, a gym beyond its useful life, recurring plumbing concerns, outdated public address system, and water intrusion near the gym connection.
Current and ongoing identified needs:
- Electrical, plumbing, and HVAC upgrades
- Interior and fire-protection improvements
- Roofing, site, exterior-door, athletic, and accessibility work
- An undersized library
- An undersized cafeteria
The district has already had to undertake major plumbing work at Thomas Haley. That demonstrates that the issue is active infrastructure risk. A rebuild would allow the district to solve the plumbing layout, cafeteria capacity, library size, circulation (HVAC Issues), restrooms, and gym connection as one coordinated project.
2022 Assessment 2025 Assessment
Frequently Asked Questions
- What is the overall condition of Thomas Haley?
- How old is the building?
- How much work does the building need?
- What problems happen day to day, and how many work orders do they create?
- Does the campus have enough space for students?
- Why the proposed replacement of Thomas Haley instead of repairing it?
